Capitol/CM

Capitol Construction Management, Inc. — Owner's Representation

The owner's seat
on mission critical work.

Data centers rarely fail on design. They fail on long-lead equipment, on commissioning, and on the distance between the schedule on paper and the one in the field. We represent the owner across all three.

30 yearsOwner-side & builder-side
$200K–$450MProject range delivered
IndependentNo GC or vendor affiliation

Our role

We do not bid the work we oversee. Independence is the product.

An owner's representative has exactly one client interest to protect. Capitol CM holds no construction contract on the projects we manage, carries no equipment lines, and takes no fee tied to the cost of the work. When the GMP arrives, when the change order lands, when commissioning slips a month — we are reading those documents for you, not defending them.

What we protectCapital. Schedule. Scope. In that order when they conflict, unless you tell us otherwise — and we will tell you when they conflict.

How we engageFixed monthly fee or lump sum by phase. Never a percentage of construction cost, which pays us more when your project costs more.

Where we startEarlier is cheaper. Most of the money is decided before a shovel moves — in site selection, utility commitments, and the procurement strategy for long-lead gear.

Scope of service

Owner's rep,
cradle to IST.

We can carry the whole lifecycle or step in at any phase — including mid-project, when a job is already in trouble.

01

Due diligence & site selection

  • Utility capacity and interconnection timeline verification
  • Fiber routes, carrier diversity, latency constraints
  • Water availability and cooling strategy implications
  • Entitlements, zoning, noise and generator permitting exposure
  • Order-of-magnitude budget and schedule reality check
02

Preconstruction

  • Basis of design and redundancy review against business requirements
  • Independent estimate validation and GMP interrogation
  • Long-lead procurement strategy — generators, switchgear, UPS, chillers, CDUs
  • OFCI versus CFCI matrix and owner-furnished equipment logistics
  • Baseline schedule, milestone structure, and risk register
03

Delivery oversight

  • GC and trade partner selection, scoping and contract negotiation
  • Change order review, entitlement analysis, claim avoidance
  • Pay application and lien waiver verification
  • Schedule oversight, recovery planning, pull planning facilitation
  • Field quality and installation conformance on the owner's behalf
04

Commissioning & turnover

  • Cx agent scoping and oversight through Levels 1–5
  • Script review and integrated systems testing witness
  • Failure-mode and load-bank testing verification
  • Punch, closeout, as-builts, O&M and warranty administration
  • Operations handover and training coordination

Where we work

Mission critical

Hyperscale Colocation AI & HPC high-density Enterprise & edge Central utility plants Generator & switchgear yards Liquid cooling conversions Healthcare critical systems

Rack densities moved faster than the buildings did. Air-cooled halls are being retrofitted for direct-to-chip, utility queues now set schedules that used to be set by steel, and equipment lead times price the job before design is finished. Those are owner problems before they are contractor problems.

Market research

US Data Center
Atlas

We maintain a register of 242 major US data center campuses — planned capacity, build status, market concentration, and which sites are facing moratoriums, referendum petitions or permit litigation. It is the same reference we use when an owner asks whether a site is deliverable.

Open the atlas

Who does the work

Leadership

Frank Fernandez

President

Three decades across construction management, general contracting and owner's representation — with executive responsibility for preconstruction, procurement and delivery on projects from $200,000 to $450 million.

Frank has sat on both sides of the table: leading builder-side operations at national contractors, and representing owners in a pure advisory capacity. That combination is the point. He has written the GMPs he now reviews, run the schedules he now audits, and negotiated the change orders he now contests.

A Lean Construction practitioner and pull-planning facilitator, he has trained owner staff, design teams and trade partners on planning discipline — the mechanism that converts a schedule into a cost outcome.

Extended team

Assigned by project

Capitol CM staffs each engagement to its scope rather than carrying overhead between projects. Depending on the assignment, that includes cost and estimating support, scheduling, commissioning oversight, and environmental, health and safety specialists — brought on under Capitol CM's direction and accountable to the owner, not to the builder.

For procurement & supplier onboarding

Capability
statement

Capitol CM holds small, disabled-veteran and minority business enterprise certifications — qualifying for owner and hyperscaler supplier diversity programs as well as public agency participation goals.

Registrations & codes

Verified
CA General Contractor
Lic. #996176
Small Business (SBE)
#1766319
DBE
#41773
MBE
Certified
SB / DVBE
Certified
CAGE Code
079273042
NAICS
541611 · 541618 · 541610
541330 · 236210 · 236220
SIC
1541 · 1542 · 8741

Start a conversation

Bring us in
before the GMP.

Email

Frank@CapitolCM.com

Phone

510.882.8477

Office

Capitol Construction Management, Inc.
Fort Lauderdale, FL